Our Projects
[vc_tta_tabs shape=”square” gap=”1″ active_section=”1″ no_fill_content_area=”true”][/vc_tta_tabs]
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2001″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
BASF | Kvaerner Process Sdn Bhd | Mechmer Keppel Engineering Sdn Bhd | Pressure Vessel | Blast SA2.5/SSPC- SP10 and apply 1coats |
BPC - BDO | BASF Petronas Chemicals Sdn Bhd | Mechmer Keppel Engineering Sdn Bhd | Pressure Vessel-Carbon Steel | Blast SA2.5/SSPC- SP10 and apply 1coats |
WTM - Kulim HI Tech | Ionics Enersave Engineering Sdn Bhd | MPL Equipment Plant Engineering S/B | Acid Storage Tank | Supply Skill Blaster and Painter to blast & Paint |
BANG BO Thailand | Organo Asia Sdn Bhd | MPL Equipment and Plant Engineering Sdn Bhd | Skid | Blast to SA 3/SSPC-SP5 apply 3coats |
San Lorenz 500 MW Combined Cycle Plant | Organo Asia Sdn Bhd | MPL Equipment and Plant Engineering Sdn Bhd | Acid Storage Tank | Blast SA2.5 and apply 3coats |
Manjung Coal Stockyard, Janamanjung | KOSH Industries (M) Sdn Bhd | Guthrie Industries (M) Sdn Bhd | Idler Stand | Blast to SA 2.5/SSPC-SP10 and apply 3coats |
Manjung Tiga - Coal Fired Power Station Waste Treatment | Alstom Power(Switzerland) Ltd | MPL Equipment and Plant Engineering Sdn Bhd | Steel Structures | Blast to SA 2.5/SSPC-SP10 and apply 3 coats |
GE Power Generation Engineering, Australia | JGC-KBR-SIME-JMSB-KMSB | Kvaerner Process Sdn Bhd | Steel Structures | Blast to SA 2.5/SSPC-SP10 and apply 2 coats |
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2002″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
Manjung 2100MCoal Fired Boiler | Alstom Power | Equator Engineering Sdn Bhd | Boiler | Power tool and apply 2 coats |
Egret Gas Development Phase 1 | Brunei Shell Petroleum | Technip Far East Sdn Bhd | Pressure vessels, ladder, platform handrail | Blast SA2.5/SSPC- SP10 and apply 3coats |
Perlis Power Station | Alstom Power | Mechmar Keppel Sdn Bhd | Roll can | Blast to SA 2.5/SSPC-SP10 and apply 1coats |
PCSB Resak Cooling Tower, Pulau Jerejak | Petronas Carigali Sdn Bhd | Penang shipbuilding & Construction Sdn Bhd | Plenum and Fan Cooler | Blast to SA 3/SSPC-SP5 apply 3coats |
PBI Line Side Cabin Rawang to Ipoh Double Tract | Keretapi Tanah Melayu | Jashin Sdn Bhd | Stainless Steel Cabins | Commercial blast and apply 2 coats |
Gelugor combined Cycle Conversion Power Plant | Hartasuma Sdn Bhd | Zealan Holdings Sdn Bhd | Steel Structures | Blast to SA 2.5/SSPC-SP10 and apply 2coats |
Fauji Kabirwala Power Station | Technip Far East Sdn Bhd | Mechmar Keppel Sdn Bhd | Pressure Vessels | Blast to SA 2.5/SSPC-SP10 and apply 3 coats |
Manjung Power Station Coal Stock Yard | Hartasuma Sdn Bhd | Zealan Holdings Sdn Bhd | Waste Watern Treatment Plant | Blast to SA 2.5/SSPC-SP10 and apply 2 coats |
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2003″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
Quey Crane | Kelang Multi Terminal Sdn Bhd | West Port Malaysia | Quey Crane | Repainting of 9 units of Quey Crane |
Bottling Plant, LPG, Prai Power Plant | Tenaga Nasional Bhd. Penang | MKE Engineering Sdn Bhd | Bullet Tank | Blast SA2.5/SSPC- SP10 and apply 3coats |
Sea Gas Compressor Station | South East Australia Gas Pte. Ltd | JBD Engineering Sdn Bhd | Header Box | Blast to SA 2.5/SSPC-SP10 and apply 3coats |
Segari Power Plant, Lumut | Segari Power Plant, Lumut | Fibrolux Gmbh, Jerman | Handrail and staircase | Touch up and apply 3coats |
Sultan Salahuddin Abdul Aziz Power Station | Sultan Salahuddin Abdul Aziz Power Station | Equator Engineering Sdn Bhd | Condenser Pipe | Blast SA 2.5 and apply baltoflake |
Janakuasa Seberang Prai | Equator Engineering Sdn Bhd | City Reserves Sdn Bhd | Chimney | Touch up and Repainting |
Asia Litharger and Time of set Gas Station | Gas Malaysia Sdn Bhd | Kejuruteraan MPE Sdn Bhd | Skids | Blast to SA 2.5/SSPC-SP10 and apply 4 coats |
Yetagun Phase 3 | Premier Pejurong Island,Singapore | JBD Engineering Sdn Bhd | Galvanised Steel Structures | Apply 3 coats |
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2004″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
Quey Crane | West Port (M) Sdn Bhd | Kelang Multi Terminal Sdn Bhd | 11 units of Quey Crane | Cleaning and Repainting |
Pelabuhan Tanjung Pelepas (PTP) | Muhibbah Steel Industries Sdn Bhd | Muhibbah Steel Industries Sdn Bhd | Bridgestone Fenders | Blast SA2.5 and apply 3coats |
Tanjung Bin Power Plant | Sumitomo-Zealand Consortium | MPL Industries Sdn Bhd | Steel Structures | Blast SA2.5 and apply 3coats |
Brunei Shell | Jord International Pte.Ltd | JBD Engineering (M) Sdn Bhd | Header Boxes and Steel Structure | Blast SA2.5 and apply 3coats |
TNB Kapar Power Station | Fuzuka Engineering & Trading Sdn Bhd | Fuzuka Engineering & Trading Sdn Bhd | Belt Conveyor | Blast SA 2.5 and apply 3coats |
Kijal Statelite Station, Terengganu | Celcom Bhd | Abenaki Sdn Bhd | Tele communication Tower | Water jet cleaning, hand tool and apply 3 coats |
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2005″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
Commercial Building at West Port 1000 Units | PLZKS | Dynamic Building Systems Sdn.bhd | Roof Trusses and Steel Structures | Power tool and apply 3 coats |
Spanger Bay, Sabah | Bridgestone Corporation, Japan | Muhibbah Steel Industareies Sdn Bhd | 84 Units of Fender | Blast to SA2.5 and apply 3 coats |
Otway Gas Onshore Gas Plant | Woods Energy Ltd/Technip | JBD Engineering (M) Sdn Bhd | Bundle Frame,Plenum and Steel Structure | Blast SA 2.5 and Apply 3 Coats |
Tanjung Bin Power Plant | Hitachi Zoshen International, Japan | Muhibbah Steel Industries Sdn Bhd | 28 units of Fender | Blasting to apply 3 coats |
BR-E CO2, Removal Topsite Platform | Sime Sembcorp Engineering Sdn Bhd | JBD Engineering Sdn Bhd | Bundle Frame,Plenum and steel Structure | Blast to SA2.5 and Apply 4 coats |
Guntung- E Offshore | Rolis Royee Energy System/Jord Pte.Ltd | JBD Engineering (M) Sdn,Bhd | Bundle Frame,Plenum and Steel Structure | Blast SA 2.5 and apply 3 coats |
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2006″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
Repainting of Conveyor Structure at Common Warehouse | West Port Malaysia | Kelang Multi Terminal. Sdn.bhd | Roof Trusses | High-Pressure water Jet cleaning, power tool and apply 3 coats |
Repainting of pipe Brackets at Cement Terminal & Pipeline Racking | West Ports Malaysia Sdn Bhd | Kelang Multi Terminal Sdn Bhd | Pipe Brackets | High-Pressure water jet cleaning, power tool and apply 3 coat |
Proposed Marina at Pulau Beast and Pulau Duyung at Kuala Terengganu | Dynamic Building Sdn Bhd | Dynamic Building Sdn Bhd | Steel Structures | Blast SA 2.5 and Apply 3 Coats |
In-Situ Blasting at Malim Mawar | TNB | Sutera Teguh Engineering Sdn.Bhd | Gas Turbine Structural Components | Only Blasting using Aluminium Qxide |
Repainting of Query Crane at Penang Port | Penang Port Of Authority | Protank (M) Sdn. Bhd | Quey Crane | High pressure water jet cleaning and repainting |
Tanjung BIN Power Plant | Sumitomo Zealand Consortium | MPL Industries Sdn Bhd | Steel Structures | Blast SA 2.5 and apply 3 coats |
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2007″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
Jimah ,Port Dickson | Tos Energy | Metal-Pipeline Corporation (M) Sdn.Bhd | Steel Structures | Blast to SA 2.5 and Apply 2 coats |
Repainting of Reefer Gantry at Zone 'A' Container Terminal | West Ports Malaysis Sdn Bhd | West Ports Malaysia Sdn Bhd | Reefer Gantry | Powertool and Apply 3 Coats |
M252A-Rawang-Ipoh Double Track | KTMB | Emrail Sdn. Bhd | Railway Wagons | Blast SA 2.5 and Apply 3 Coats |
Painting of Office Building and Warehouse | MKE Engineering Sdn.Bhd | MKE Engineering Sdn. Bhd | External Surface of Building | Water jet cleaning and apply tow layers of waterborne epoxy paint |
TBM T60 Congeneration Plant | Mude paper Mills Sdn Bhd | Delcom Services Sdn.Bhd | Filter Houses,Duction.Lube Oil Cooler and Air Qutlet | Blast SA 2.5 and Apply 3 coa ts |
2CS drums & 3 Towers for Dung Quat Refinery, Vietnam | KNM Exotic Equipment Sdn. Bhd | Technip France | Pressure Vessels | Blasting to SA2.5 and Apply 3 coats |
Refurbishnment Morris RTG (1-10) and Mitsui RTG (15-45) | West Ports Malaysia Sdn Bhd | West Port Malaysis Sdn Bhd | 46 unit crane | Blasting and repaint with 3 coats system |
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2008″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
Sime Darby MOQ1.6 | Exxon mobile | Siemens Pte Ltd | 6 nos. of Vessel | Blast to SA 2.5 and apply 3 coats |
2600MT.Bloodiesel Storage Tanks | Felda-Johor Bulkera (No Suggestions) | HMS Corporation Sdn. Bhd | 9 nos. of Tanks | Blast to SA 2.5 and Apply 3 coats |
Azurita FDPSO | Murphy West Africa | Bukit Faraser Thermal Tech. Sdn Bhd | SKID | Blast SA 2.5 and Apply 3 coats |
Package 16 BE Process & BG Utility Plat form Offshore Qatar | mares Oil Qatar | Petra Fabricators Sdn. Bhd | SKID | Blast SA 2.5 and Apply 3 coats |
12 Final Sulphur Condensers for Purging Gas Field | KNM Exotic Equipment Sdn. Bhd | KNM Exotic Equipment Sdn Bhd | 12 Final Sulphur Condensers | Blast SA2.5 and Apply 3 coats |
Occidental Mukhaizna Oman | Nem BV Industrial & Utility Boiler | Jord Malaysia Sdn Bhd | Header Boxes and Steel Structure | Blast SA 2.5 and Apply 3 coats |
Lumut Power Plant Block 3 | Jimah Power Plant | Alston Power Asia Pacific Sdn. Bhd | Weather Protection and Coating of Cooling Tower | Blasting to SA2.5 and 3 coats |
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2009″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
Anchor Handling Tug Supply | Sea Link | Boustead Penang Shipyard Sdn. Bhd | Anchor Handling Tug | Blast SA2 and apply 2 coats |
Recoat Unit 5 Bottom Ash Hopper Steel Structure | TNB Repair and Maintenance Sdn. Bhd | Fuzuka Engineering & Trading Sdn.Bhd | Steel Structure | Blast SA 2.5 and Apply 3 coats |
Unit 2 Temengor Power Station, Grik | TNB Repair and Maintenance Sdn.Bhd | Sutera Teguh Engineering & Trading Sdn.Bhd | Structure | Reblast to achieve minimum standard SA2.5 |
Jimah Power Plant | Alstom Power Asia Pacific Sdn.Bhd | Alstom Power Asia Pacific Sdn bhd | Motor Cover Room | SA 2.5/SSPC SP10 and apply 2 coats |
Sarawak Shell Bhd, F23, VLAP | Sarawak Shall Bhd | Dynac.Sdn.Bhd | Steel Structure | Blast SA2.5/SSPC SP1L and Apply 3 coats |
250,000 MTPY, Bio Disel Plant.Telok Gong, Kemaman | Sumatec sdn bhd | I Palm Supply Sdn. Bhd23 nos of Tanks | 23 nos of Tanks | Blasting and following 3 coats |
Flare Riser for Pluto Onshore | Long Australia | KNM Exotic Equipment Sdn BH | Riser | Blast SA 2.5 and Apply 3 coats |
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2010″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
Bogie Frame Stress Relief | Scomi Rail Bhd | Scomi Rail Bhd | Frame Assembly | Blast SA2.5 and apply 3coats |
KNM Ogpet (East Coast) Sdn Bhd | Cupiagua Gas Plant, Colombia | KNM Ogpet (East Coast) Sdn Bhd | Vessel, Shell & Tube Heat Exchanger and Skid | Blast SA2 and apply 3coats |
E & I Building | Tylon Sdn Bhd | Malaysia Marine and Heavy Engineering | Equipment & Instrument Cabin | Blast SA2.5 and apply 3coats |
West Module | Tylon Sdn Bhd | Malaysia Marine and Heavy Engineering | DE MI Module | Blast SA2.5 and apply 3coats |
Keppel Merlimau | Alstom Power Singapore Pte Ltd | Alstom Power Singapore Pte Ltd | Demin Water Tank | Blast SA2.5 and apply 2 coats |
Anchor Handling Tug Supply | Sea Link | Boustead Penang Shipyard Sdn Bhd | Anchor Handling Tug | Blast SA2 and apply 2 coats |
Recoat unit 5Bottom Ash Hopper Steel Structure | TNB Repair and Maintenance Sdn Bhd | Fuzuka Engineering & Trading Sdn Bhd | Steel Structure | Blast SA2.5 and Apply 3 coats |
Unit 2 Temengor Power Station, Grik | TNB Repair and Maintenance Sdn Bhd | Sutera Teguh Engineering Sdn Bhd | Structure | Reblast to achieve minimum std SA 2.5 |
Pusat Pengumpulan Sampah | Mega Element | LKIM, Pasir Puteh, Kelantan | Steel Structure | Blast SA2.5 and Apply 3 coats |
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2011″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
Oil Search (PNG) LTD | Aker Solutions | Bukit Fraser Thermal Technology Sdn Bhd | Skid, Ball Valve, Pipings, Vessel, Heat Exchanger | Blast SA2.5 and apply 3coats |
E 8 & F13 Compression | Dynac Engineering Sdn Bhd | Dynac Engineering Sdn Bhd | Bundle Frame, Plenum, Fan Rings | Blast SA2 and apply 3coats |
Reburshiment of steel structure | Firematic Engineering (M) Sdn Bhd | Ansell | Factory Steel Frame | Reblast and apply 2 coats |
Syarikat Tukang Besi Sdn Bhd | Syarikat Tukang Besi Sdn Bhd | Syarikat Tukang Besi | Steel Railing | Blast SA2.5 and apply 3coats |
Simon & Simon Engineering Sdn Bhd | Simon & Simon Engineering Sdn Bhd | Simon & Simon Engineering Sdn Bhd | Smoothen Joint Area | Smoothem joint area and patch with sika cement |
KJV Gorgon - Barrow Island LNG Plant | Krohne Oil & Gas (M) Sdn Bhd | Bukit Fraser Thermal Technology Sdn Bhd | Skid , piping and accesories | Blast SA 2.5 and apply 3 coats |
Shin Eversendai Engineering S/B | Shin Eversendai Enginerring S/B | Shell Sarawak | Steel Structure | Only Blasting |
Lipids Terminal (M) S/B | Lipids Terminal (M) S/B | Lipids Terminal (M) S/B | Internal Tank | Blast SA2.5 and apply 3 coats |
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2012″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
SOGT-PCSB Sabah Oil and Gas Terminal Project | Samsung Engineering (M) Sdn. Bhd. | Kencana Torsco Sdn. Bhd | Pipes | Blast SA2.5 and apply 3 coats |
ATB Terminal And Jetty Top-Side Facility | ATB | PEC (M) Sdn. Bhd. | Pipe Lines and BallValves | Power tool and apply 3 coats |
Suria Offshore-SOGT Piping & Installation | Samsung Engineering (M) Sdn. Bhd. | EPIC Mushtari Engineering Sdn. Bhd. | Piping | Blast SA2.5 and apply 3 coats |
Seal Gas Recovery, BLNG Brunei | Peerless Asia Pacific Pte Ltd | Petra Fabricators Sdn. Bhd. | Vessels and Skid Structures | Blast SA2.5 and apply 3 coats |
Kebangan Northern Hub Development | Kebangan Petroleum Hub Development | Dynac Engineering Sdn. Bhd. | Header Boxes and Steel Structures | Blast SA2.5 and apply 3 coats |
Lynas Advanced, Kuantan Pahang | Vickers Hoskins (M) Sdn. Bhd. | Vickers Hoskins (M) Sdn. Bhd | Handrails | Blast SA2.5 and apply 2 coats |
KBB Northern Hub | KPOC | VME Technical Services Sdn. Bhd. | Heat Exchanger | Blast and apply 3 coats |
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2013″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
Fuel Storage Tank | Jayapadu Sdn Bhd | Petron Bhd | Bottom Plate | Blast SA2.5 and apply 2 coats |
Zawtika Development Pjhase 1A | Some PTE LTD | Jord (M) Sdn Bhd | Header Boxes | Blast and apply 3 coats |
TNB Jana Manjung | Alstom China | Bennova Engineering Sdn Bhd | Steel Structure | Blast SA2.5 and apply 2 coats |
Cameron Malaysia Sdn Bhd | Cameron Malaysia Sdn Bhd | Cameron Malaysia Sdn Bhd | Skid | Blast SA2.5 and apply 3 coats |
Prai, Pipes | HMS Corporation Sdn Bhd | HMS Corporation Sdn Bhd | Piping | Sweep blast and apply Powercrete R95 |
Repainting of Luffing Crane | Mobile Pacific Sdn Bhd | Mobile Pacific Sdn. Bhd | Crane | Blast SA2.5 and apply 2 coats |
Custody Gas Metering Skid For DGDM. | Petronas | Petronas | Valve | Blast and apply 3 coats |
Tapis R Fuel Gas & Seal Gas Package | Prosep | Exxon Mobil | Vessels | Blast and apply 3 coats |
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2014″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
Repainting of Impsa Quay Crane | Bintulu Port Sdn Bhd | Bintulu Port Sdn Bhd | Quay Crane | Power tool and apply two coats system |
Blasting and Painting of Carbon Steel pipe and Fittings | Landfeld Engineering (M) Sdn Bhd | Lanfeld Engineering (M) Sdn Bhd | Pipe and Fittings | Blast and apply one coats system |
SBM Offshore | VME Technical Sdn Bhd | VME Technical Sdn Bhd | Valve | Reblast and Repaint and three coats system |
Sipatan | Hammer Engineering Sdn Bhd | Petronas Gas Bhd | Spool | Blast and apply three coats system |
Tanjung Bin 4 1 x 1000MW Coal Fired Power Plant | Alstom Services Sdn Bhd | Alstom Services Sdn Bhd | GGH, Duct and Absorber | Linning Application |
Infrastructure Engineering Store Building | Palm Oleo Sdn Bhd | Palm Oleo Sdn Bhd | Tank | Blast and coat as per client specification |
Painting of Cable Tray | Ranhill E & C Sdn Bhd | Ranhill E & C Sdn Bhd | Cable Tray | Blast and apply three coat system |
Protective Coating for RTG 1, 2 & 4 | Mobile Pacific Sdn Bhd | Kuantan Port Consortium Sdn Bhd | RTG Crane | Power tool and apply three coat system |
Ritz Corp Suites (TI), KL | Jetson Lucksoon Sdn Bhd | Ritz Corp Suites (TI), KL | Steel Structure | Blast and apply three coat system |
Instep, Terengganu | Petrofac Energy Development Sdn Bhd | Petrofac Energy Development Sdn Bhd | Steel Structure | Blast and apply two coat system |
Painting of Header Boxes & Stainless Steel | Jord Malaysia Sdn Bhd | Jord Malaysia Sdn Bhd | Header Boxes / Stainless Steel | Blast and apply two coats system |
Ichthys | Seremban Engineering Sdn Bhd | Kencana HL | Skid Structure | Blast and apply two coats system |
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2015″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
Westport Biodiesel Tank | KL-Kepong Oleomas Sdn Bhd | KL-Kepong Oleomas Sdn Bhd | Internal Tank | Reblast and apply three coat system |
Impsa Quay Crane | Bintulu Port Sdn Bhd | Bintulu Port Sdn Bhd | Quey Crane | Blast and apply two coat system |
TGAST Development | Petronas Carigali Sdn Bhd | Petra Fabricators Sdn Bhd | Vessel | Blast and apply three coat system |
EPCC For Sipitang Tee-Off Metering Station, Sipitang Sabah. | Misi Setia Oil & Gas Sdn Bhd | Misi Setia Oil & Gas Sdn Bhd | Skid | Blast and apply three coat system |
Flare Stack BCP Lemongrass | Yee Loong Engineering Sdn Bhd | Yee Loong Engineering Sdn Bhd | Steel Structure | Blast and apply three coat system |
CDU Overhead Condenser | Dynac Engineering Sdn Bhd | Dynac Engineering Sdn Bhd | Steel Structure | Blast and apply three coat system |
RCR Energy | Bukit Fraser Thermal Technology Sdn Bhd | Bukit Fraser Thermal Technology Sdn Bhd | Vessel | Blast and apply three coat system |
Siemens Malaysia Sdn Bhd | Siemens Malaysia Sdn Bhd | Siemens Malaysia Sdn Bhd | Motor | Blast and apply three coat system |
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2016″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
Pengerang Fabrication Shop | KNM Process Systems Sdn Bhd | KNM Process Systems Sdn Bhd | Tanks | Blast and apply 3 coats |
Iconic Structure, 3 Side. | Revillon Metal Sdn Bhd | Revillon Metal Sdn Bhd | Fire Proofing | Blast and apply 3 coats |
Bukit Fraser Thermal Technology Sdn Bhd | Bukit Fraser Thermal Technology Sdn Bhd | Bukit Fraser Thermal Techmology Sdn Bhd | Condenser | Blast and apply 3 coats |
Johor Port | Mobile Pacific Sdn Bhd | Mobile Pacific Sdn Bhd | Bulk Gantry Crane No. 1 | Blast and apply 3 coats |
Macgregor Malaysia Sdn Bhd | Macgregor Malaysia Sdn Bhd | Macgregor Malaysia Sdn Bhd | Hook Block | Blast and apply 3 coats |
Econex Sdn Bhd | Econex Sdn Bhd | Econex Sdn Bhd | Hoist Base & Stop Log | Blast and apply 3 coats |
IFUB | Petra Fabricators Sdn Bhd | Petra Fabricators Sdn Bhd | Steel Structure | Blast and apply 3 coats |
Tech Centre Engineering Sdn Bhd | Tech Centre Engineering Sdn Bhd | Tech Centre Engineering Sdn Bhd | Steel Structure | Blast and apply 3 coats |
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2017″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
Roof Tank Waterproofing Work | Samsung C & T (KL) Sdn Bhd | Samsung C & T (KL) Sdn Bhd | Tanks | Blast and apply 3 coats |
North Port Installation (NPI) | Risen Oil & Gas Sdn Bhd | Risen Oil & Gas Sdn Bhd | Tanks | Sweep blast |
National Aquatic Centre (KL) | Pfeifer | Pfeifer | Mainpool and training pool | Cleaning of membrane |
Penjom Gold Mine | Material Protection Engineering Sdn Bhd | Material Protection Engineering Sdn Bhd | Steel Structure | Blast and apply 2 coats |
Bangi | Poratha Corporation Sdn Bhd | Poratha Corporation Sdn Bhd | Tank | Blast and apply 2 coats |
Rapid Package 16A | Wabag Muhibbah JV Sdn Bhd | Wabag Muhibbah JV Sdn Bhd | Tank | Blast and apply 2 coats |
Aquatic Centre Bukit Jalil | Armada Baiduri Sdn Bhd | Armada Baiduri Sdn Bhd | Structural and Architectural Works. | Solvent Clean and apply 3 coats |
[vc_custom_heading text=”MAJOR PROJECT EXECUTED 2018″ font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Project | Client | Main Contractor | Material | Scope of Work |
---|---|---|---|---|
Reburshiment of PGB-GTR line | Asia Propel Sdn Bhd | Petronas | Internal Pipes | Blast and apply three coats system |
Cradle | KMS | KMS | Cradle | Blast and apply 2 coats system |
Hassi Messaoud upside north PJ | Matten Plants Pte Ltd | JGC Corporation JGC Algeria | Skid | Blast and apply 2 coats system |
MRT 2 | Synchoong Hoe Eng Sdn Bhd | George Kent & CCCG | Rail | Blast and apply 1 coats system |
Rapid, Penggerang Johor | Wabag Muhibbah JV Sdn Bhd | Rapid | Sucstation far building | Blast and apply 2 coats system |
SDPB Jomalina | Samsung C & T (KL) Sdn Bhd | Petronas | Stencil work | Blast and apply 2 coats system |
Pembinaan barrage, sg, Johor, Daerah Kota Tinggi, Johor. | Enermore Sdn Bhd | Kementerian Tenaga Teknologi Hijau dan air | Stop log | Blast and apply 4 coats system |
[vc_custom_heading text=”Fire poofing” font_container=”tag:h2|text_align:center|color:%2355ac46″ google_fonts=”font_family:Open%20Sans%3A300%2C300italic%2Cregular%2Citalic%2C600%2C600italic%2C700%2C700italic%2C800%2C800italic|font_style:700%20bold%20regular%3A700%3Anormal” css_animation=”bounceInUp”][vc_empty_space]
Period | Project | Owner | Item | Remarks |
---|---|---|---|---|
July 2011 | Putrajaya Precint 1 | Putrajaya Development Bhd | Steel Structure | Bennova Engineering Sdn Bhd |
July 2012 | P12-414 Siakap C1 | SBM | Skid | VME Process |
January 2014 | KLIA 2 | KLIA Bhd | Steel Structure | Tata Engineering Sdn Bhd |
March 2014 | KLIA 2 | KLIA Bhd | Steel Structure | Metrovest Engineering Sdn Bhd |
Feb 2015 | Setia Convention Centre | Setia Eco Park Bhd | Steel Structure | Setia Kon Building |
August 2015 | Zadio | Saudi Aramco | Steel Structure | Jord Sdn Bhd |